Keywords = |
Number of Proceedings: 7 |
|
1 |
|
OPTIMIZATION OF PROJECT TIME-COST TRADE-OFF WITH CONTROLLED CASH FLOWS |
|
Mohamed Abo-Zaid, Tamer El-Korany, Emad E. Etman, Salah El-Din F. Taher |
|
Show Article
|
|
2 |
|
Finance Based Scheduling Optimization Model for Construction Projects Portfolio Using Enhanced Genetic Algorithm |
|
Hesham A. Abdel-khalek, Sherif M. Hafez, Hamada A. Kassem |
|
Show Article
|
|
3 |
|
Optimizing Cash Flow of Construction Projects through Material Procurement Plans |
|
Mahmoud AbuElnasr, Emad Etman, Haytham Sanad |
|
Show Article
|
|
4 |
|
Optimum Cost Design of Reinforced Concrete Beams Using Artificial Bee Colony Algorithm |
|
F. A. Abdelmgeed, M. Ghallah, A. Hamoda |
|
Show Article
|
|
5 |
|
Productivity and Safety Based Model for Construction Site Layout Optimization |
|
Haytham M. Sanad, Mohammad A. Ammar |
|
Show Article
|
|
6 |
|
OPTIMIZATION OF HIGH-PERFORMANCE STEEL-CONCRETE COMPOSITE BEAMS CONSIDERING CARBON EMISSIONS |
|
Yunyi Deng, Kang Chen, Linzheng Huang, Bo Yang |
|
Show Article
|
|
7 |
|
Integrating GIS and Optimization Techniques for Effective Demolition Waste Management |
|
Mahmoud Metawie, Eman Othman, Mohamed Marzouk |
|
Show Article
|